Covering structure of the coal yard in Harbin


This project is located in Harbin, with an area of 800 square meters. The construction content includes the fabrication, processing and installation of steel structures and membrane materials. The membrane material used is domestic PVDF membrane, with a normal service life of 15 years. Completion date: January 2017