The membrane structure project of the circus building in Manzhouli

This project is located in Manzhouli, with an area of 60,400 square meters.
Construction content: Manufacturing, processing and installation of steel structures and membrane materials;
The membrane material is made of domestic PVDF membrane material, and its normal service life is 15 years.
Completion date: July 2017