Liaoyang TBEA Electric Vehicle Parking Canopy Membrane Structure

The project is located within the Liaoyang Special Transformer Factory in Liaoning Province, with a construction area of 230㎡. The work scope includes fabrication, processing, and installation of steel structures and membrane materials. Domestic PVDF membrane material is used, with a normal service life of 15 years. Completion date: September 2018.