Analysis of the Installation Service Process of Tension Membranes by the Factory in Shenyang

Shenyang Membrane Structure Official Website Time:2026-06-10

I. Preliminary Consultation and Understanding of Requirements 

At the beginning stage of the tensioned membrane installation service process, the client will first communicate with the manufacturer, detailing the project requirements, including the shape, size of the building, and the application scenarios of the tensioned membrane. During this step, the manufacturer will, based on the information provided by the client, preliminarily assess the project's feasibility and provide a preliminary design plan and quotation. 


II. Scheme Design 

Based on the requirements understood through the previous communication, the manufacturer will carry out detailed design work. This stage mainly includes the following contents: 

1. Select the appropriate tension membrane material: Based on the customer's application environment and budget, choose a tension membrane material with strong weather resistance and meeting the required fire resistance standards. 

2. Design the shape and size of the tensioned membrane: Based on the characteristics of the building and aesthetic requirements, design an aesthetically pleasing and practical shape and size for the tensioned membrane. 

3. Determine the supporting structure: Based on the shape and size of the stretched membrane, design a stable and aesthetically pleasing supporting structure to ensure the stability and safety of the stretched membrane after installation. 

4. Prepare design drawings: After completing the above design work, the manufacturer will provide detailed design drawings for subsequent construction. 


III. Materials Preparation 

After the scheme design is completed, the manufacturer will enter the material preparation stage. This stage mainly involves the following tasks: 

Purchase tension membrane and related materials: According to the design plan, purchase the necessary materials such as tension membranes, steel cables, and supports. 

2. Material Inspection: During the material procurement process, rigorous quality inspections are conducted on the materials to ensure they meet national standards and design requirements. 

3. Material Storage: The purchased materials should be classified and stored according to their types, specifications, etc., so as to facilitate their use in the subsequent construction process. 


IV. On-site Construction 

After the materials are prepared, the manufacturer will carry out the on-site construction. The construction process is as follows: 

Set up the supports: According to the design drawings, build stable supports on the site, ensuring that the supports meet the design requirements. 

2. Installation of tensioned membrane: Install the tensioned membrane onto the supports according to the design drawings, and adjust it to the specified dimensions. 

3. Steel cable tensioning: Use professional equipment to tension the steel cables, ensuring that the tensioned membrane is taut and meets the design requirements. 

4. Safety Inspection: During the installation process, conduct regular safety checks to ensure safety throughout the construction. 


V. Project Acceptance and After-sales Service 

After the tensioned membrane installation is completed, the manufacturer will organize professional personnel to conduct the project acceptance. The acceptance contents include: 

Check the installation quality of the tensioned membrane: Ensure that the tensioned membrane is installed properly and meets the design requirements. 

2. Inspect the supporting structure: Check the stability and safety of the support, and ensure that the supporting structure meets the design requirements. 

3. Check for problems during the construction process: Rectify any issues identified during the construction. 

After the acceptance is qualified, the manufacturer will provide after-sales service, including regular maintenance, replacement of damaged parts, etc., to ensure the service life and effect of the tensioned membrane. 


The installation service process of the tension fabric products from Shenyang Tension Fabric Factory mainly consists of five stages: pre-counseling, scheme design, material preparation, on-site construction, project acceptance and after-sales. Through this process, the factory can provide customers with professional, efficient and safe services, ensuring the installation quality and service life of the tension fabric.